Installation steps:


Get started


  • Prepare the steel frame structure

  • Install the power cabinet at the designated position

  • Take the main power cable and the main signal cable and route them to the corresponding positions according to the system diagram

  • Take a single column of modules and mount them to the first column at the corresponding position from left to right

  • Install the connecting pieces between the first and second columns

  • Lock the module reinforcement screws

  • Then take a single column of modules and mount them to the second column, and adjust the spacing

  • Install the connecting pieces between the second and third columns

  • Lock the module reinforcement screws

  • Take a single column of modules and mount them to the third column, and adjust the spacing

  • Install all screens in sequence as described above

  • Complete the wiring according to the system diagram

  • Connect the signal cable between the screens

  • Connect the screen power cable

  • Connect the power cable to the cabinet air-break switch

  • Connect the mains to the electrical cabinet

  • Connect the signal cable between the screen and the transmission controller

  • Connect the HDMI and USB cables between the transmission controller and the computer

  • Installation complete

  • Light up the screens to debug